伊人大综合,日本18hd,东京热加勒比无码少妇,www.cao

Jiangmen hardware accessories factory analyzes its mold processing process arrangement

2019-12-29 1198

  Mold making refers to the processing of forming and blank making tools, in addition to shear mold and die-cutting mold. Generally, the mold has two parts: upper mold and lower mold. The steel plate is placed between the upper and lower dies to realize the material forming under the action of the press. When the press is opened, the workpiece determined by the die shape will be obtained or the corresponding waste materials will be removed. As small as electronic connector, as large as the automobile dashboard, the workpiece can be molded with mold. Progressive die refers to a set of die which can automatically move the workpiece from one station to another and get the forming parts at the last station. Die processing technology includes: cutting die, blanking die, compound die, extrusion die, four slide die, progressive die, stamping die, die cutting die, etc.

  Process flow arrangement

  1. Bottom surface processing, processing quantity guarantee;

  2. Casting blank datum alignment, 2D and 3D mold surface allowance inspection;

  3. Rough machining of 2D and 3D profile, non installation non working plane (including safety platform surface, buffer installation surface, pressing plate plane and side datum plane);

  4. Before semi finishing, the side datum should be aligned correctly to ensure the accuracy;

  5. Semi finish machining of 2D and 3D profile, finish machining of all kinds of installation working surfaces (including limit block installation surface and contact surface, insert installation surface and back side, punch installation surface, waste cutter installation surface and back side, spring installation surface and contact surface, all kinds of travel limit working surface, wedge installation surface and back side), semi finish machining of all kinds of guide surfaces and guide holes, leaving allowance for finish machining process Datum hole and height datum, and record data;

  6. Check and recheck the machining accuracy;

  7. Fitter setting process;

  8. Before finishing, align the reference surface of the process reference hole and check the allowance of the insert;

  9. Finish machining profile 2D, 3D, side punching profile and hole position, finish machining process reference hole and height reference, finish machining guide surface and guide hole;

  10. Check and recheck the machining accuracy.

  Jiangmen hardware accessories factory http://m.cyuy.cn//


丰满人妻日韩无码一区二区不卡| 欧美日韩成人影院| 熟妇人妻系列aⅴ无码专区友真希| 国产蜜臀AV无码一区亚洲| 肥臀熟妇真爽一区二区| 在线亚洲97SE亚洲综合在线| 亚洲AV无码一区二区三区毛片| 精品久久秘 秘 av| 婷婷AV一区二区三区| 国产精品99| 一二三四区AV| 无遮挡亲胸捏胸免费视频| 公侵犯玩弄熟睡人妻中文| 日本熟妇色XXXXX日本妇| 插插射啊爱视频日a级| 99热精品在线成人网| 搞搞免费视频| 60分钟三级全黄| AV无码国产精品色午夜麻豆| 老熟女老女人老熟妇av| 快乐五月婷婷色婷在线| 久久久动态日本| 亚洲肥老太bbw中国熟女| 久久丫精品国产亚洲av| 九九熟熟女东北女/| 我在ktv被六个男人玩一晚上| 尤物网站在线进入| 欧洲亚洲视频无码| 精品亚洲AV无码 一区二区三区| www.国产无套精品. com| 麻豆AV在线播放| 精品少妇无码一区二区三批| 国产伦精品一区二区三区在线播放器| 高潮潮喷奶水飞溅视频无码| 女人爽到高潮免费视频大全| 人妻哺乳奶头奶水| 日屄视频无码视频在线免费观看| 天堂v亚洲国产v第一次| 性爱啪啪啪啪视频| 妺妺窝窝体色| 日韩欧美亚洲综合久久影院|